7-15
Days for a consultant assessment
<2
Minutes for a validated layout
3
Asset classes in the pilot
0
Generative models in the output path
The problem

The number that shapes the building is guessed.

The system

Constraint satisfaction, not generation.

Strategies propose placements. A geometry engine validates them. Nothing is invented.

  1. 01

    Real Equipment, Real Clearances

    The catalogue is built on published manufacturer footprints and service clearances, including the tube-pull zone off one short end — which is what actually drives spacing in a plant room. A headroom check runs against unit height plus overhead clearance.

  2. 02

    Propose, Then Validate

    Deterministic packing strategies suggest positions — row-major, column-major, rotated. A geometry engine then checks every candidate against the room envelope and against every other unit. The governing rule is the subtle one: a unit body may not enter another unit's keep-out, but two keep-outs may legitimately overlap, because a service aisle is shared.

  3. 03

    Score, Don't Just Fit

    Valid layouts are scored on space utilisation and compactness, so the winner leaves contiguous free floor for expansion rather than scattered gaps. The engine returns the best layout plus alternatives, as a scaled floor plan and as structured data. An infeasible brief returns a reason, not a silent failure.

The decision that shaped it

The first version used AI to draw. That was wrong.

The obvious build was a generative one: describe the room, let an image model produce the layout. It worked well enough to demo. It was replaced with about 800 lines of deterministic geometry, for two reasons — and the second matters more than the first.

Cost per revision. The entire value proposition is that you can explore options freely: re-run the same brief under a different fire code, a different redundancy standard, tighter clearances, lower headroom. That only works if a revision is nearly free. Generative image calls are not nearly free, and the economics collapse exactly where the product is supposed to be strongest.

Verifiability. A generated image can only be believed. A drawing derived from exact published dimensions can be checked — unit counts, clearances and service gaps are correct by construction, and an engineer can measure them straight off the output. For work that feeds a real investment decision, that difference is the whole thing.

"The problem was geometry, not imagery. The obvious tool was the wrong tool."

Where AI does belong here is the input edge, not the output: reading a brief in plain language, pulling constraints out of a standards document, answering questions about why a layout came out the way it did. That is the next phase. The geometry stays deterministic.

The outcome

Concept stage, before a consultant is appointed.

Metric Before After
Time to a concept layout 7–15 working days Minutes
Cost per revision Billable hours or queue time Near zero
Options explored Rationed — first workable layout wins As many as the site deserves
Changing the rule set A new engagement Re-run under a different code or redundancy standard
Design review "We'll revise and come back" Regenerated in the meeting
Consistency between projects Varies by person and by month Same rules applied every time, checkable against the drawing

Scope: output is conceptual, for planning, feasibility and bid stages. Detailed engineering, statutory approval and stamped drawings remain with a licensed engineer. The tool is designed to make the early decision better informed, not to replace the person who signs the drawing. Currently in a funded pilot across three asset classes.

The design principle

Use AI where it earns its cost. Not everywhere.

"If the output has to be checked, it has to be constructed — not generated."

There is a strong pull right now to put a model at the centre of every system. Sometimes that is right. Here it was not: the work was geometric, the constraints were known and published, and the answer needed to be verifiable by someone who would be held responsible for it.

The useful test is simple. Ask what happens if the output is subtly wrong and nobody notices. If the answer is a bad afternoon, generation is fine. If the answer is a building that does not work, the calculation should be deterministic and AI should sit at the edges — reading the brief, explaining the result, handling the language — where being approximately right is genuinely good enough.